New Metro-North power substation opens in Conn. - DC News FOX 5 DC WTTG

New Metro-North power substation opens in Conn.

Posted: Updated:

NEW HAVEN, Conn. (AP) - A fifth new power supply substation has been put into service on Metro-North's New Haven commuter rail line that officials say will add redundancy to help avoid electrical outages.

Connecticut Gov. Dannel P. Malloy and state transportation officials on Thursday toured the New Haven Rail Yard. It's being upgraded and expanded over several years at a cost of $1.15 billion.

The State Bond Commission recently approved $80 million to pay for a new warehouse for rail car components, storage tracks for rail cars, demolition of an old storage facility and a pedestrian bridge linking Union Station and the yard.

A fire last month that destroyed equipment in Greenwich used for switching trains forced delays. In September, a power outage in suburban New York City limited Metro-North service for nearly two weeks.

Copyright 2014 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

  • Connecticut NewsConnecticut NewsMore>>

  • Lawsuit settlements reached in Metro-North crash

    Lawsuit settlements reached in Metro-North crash

    Monday, September 15 2014 8:39 PM EDT2014-09-16 00:39:39 GMT
    Four of 28 people who sued the Metro-North Railroad in federal court after being injured in a Bridgeport train crash last year have settled with the commuter railroad.
    Four of 28 people who sued the Metro-North Railroad in federal court after being injured in a train crash in Connecticut last year have settled with the commuter railroad.
  • Feds inspect pump at Millstone nuclear complex

    Feds inspect pump at Millstone nuclear complex

    Monday, September 15 2014 2:30 PM EDT2014-09-15 18:30:43 GMT
    Federal inspectors are at the Millstone nuclear power complex in Waterford to examine a critical backup water pump that failed routine tests in July and last week.
    Federal inspectors are at the Millstone nuclear power complex in Waterford to examine a critical backup water pump that failed routine tests in July and last week.
  • Death row inmate seeks kosher diet

    Death row inmate seeks kosher diet

    One of two men convicted in the killings of a mother and her two daughters in a 2007 Connecticut home invasion is suing Connecticut, claiming his rights are violated because he's being denied kosher food in...
    One of two men convicted in the killings of a mother and her two daughters in a 2007 Connecticut home invasion is suing the state, claiming his rights are violated because he's being denied kosher food in prison.
Powered by WorldNow
Untitled

WTTG FOX 5 & myfoxdc
5151 Wisconsin Ave. NW
Washington, DC 20016
Main Number: (202) 244-5151
Newsroom: (202) 895-3000
fox5tips@wttg.com

Didn't find what you were looking for?
All content © Copyright 2000 - 2014 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | New Terms of Service What's new | Ad Choices